首页 社会内容详情
新2手机管理端网址(www.99cx.vip):Ringgit opens flat ahead of OPR decision later this week

新2手机管理端网址(www.99cx.vip):Ringgit opens flat ahead of OPR decision later this week

分类:社会

网址:

SEO查询: 爱站网 站长工具

点击直达

新2手机管理端网址www.99cx.vip)实时更新发布最新最快最有效的新2手机管理端网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

KUALA LUMPUR: The ringgit opened flat today against the US dollar ahead of the Bank Negara Malaysia (BNM) Monetary Policy Committee (MPC) meeting scheduled this week although demand for the greenback remained strong due to its safe-haven status, an analyst said.

At 9 am, the local currency stood at 4.4060/4100 against the US dollar compared with 4.4060/4085 at the close on Friday.

Bank Islam Malaysia Bhd chief economist Dr Mohd Afzanizam Abdul Rashid said the ringgit was expected to remain stable at around RM4.40 today.

"The possibility of a higher Overnight Policy Rate (OPR) this week could sustain the value of the ringgit.

"The negative real rate of interest at the moment could motivate BNM to raise the OPR in order to incentivise savers to place their savings in bank deposits and to avoid excessive risk-taking behaviour," he told Bernama.

,

皇冠博彩 网址www.hg9988.vip)是一家值得信赖的博彩公司网址,皇冠博彩公司官方投注网开放皇冠信用网代理申请、信用网会员开户,线上博彩的官方网址。

,

However, SPI Asset Management managing partner Stephen Innes opined that ongoing global growth concerns could dampen enthusiasm for the ringgit.

"In a slower global growth environment, emerging market currencies, and especially commodity exporters, tend to trade weaker during the initial phase of the downturn," he said.

The ringgit traded lower against a basket of major currencies except the Singapore dollar.

The local currency was lower against the British pound at 5.3326/3374 against Friday’s close of 5.3163/3193, weakened versus the Japanese yen to 3.2644/2676 from 3.2483/2504 previously, and fell vis-a-vis the euro to 4.5963/6005 from 4.5060/6086.

However, it appreciated against the Singapore dollar to 3.1550/1583 from 3.1596/1618 last Friday. - Bernama


转载说明:本文转载自Sunbet。
  • 偏科不可怕,只怕门门差 @回复Ta

    2022-08-28 00:13:30 

    In a filing with Bursa Malaysia, Willowglen said the contract is for the design, supply, delivery, installation, configuration, testing and commissioning of TRX Integrated Management System.作者明白人

发布评论